File #: 20-2748   
Type: Orange County Local Transportation Authority Item Status: Passed
File created: 6/3/2020 In control: Transit Committee
On agenda: 9/10/2020 Final action: 9/10/2020
Title: Agreement for Metrolink Train Stations Platform Detectable Tiles Replacement and Painted Guideline Restriping Project
Sponsors: Jason Lee, James G. Beil
Attachments: 1. Transmittal, 2. Staff Report

Title

Agreement for Metrolink Train Stations Platform Detectable Tiles Replacement and Painted Guideline Restriping Project

 

Overview

The Orange County Transportation Authority is responsible for the ongoing maintenance of the operating railroad right-of-way for the Metrolink stations in Orange County. Aligned with that responsibility, the platform detectable tiles and painted guidelines at six Metrolink stations require replacement. Board of Directors’ approval is requested to execute the agreement.

 

Recommendation(s)

A.                     Find AP Construction, Inc., the apparent low bidder, as non-responsive for failure to complete and submit the List of Subcontractors form with the bid as required by the California Public Contract Code and for failure to sign the Disclosure of Lobbying Activities form as required by the bid instructions and the Federal Transit Administration.

B.                     Authorize the Chief Executive Officer to negotiate and execute Agreement No. C-0-2413 between the Orange County Transportation Authority and Two Brothers Construction Corp., the lowest responsive, responsible bidder, in the amount of $1,098,000, for the Metrolink train stations platform detectable tiles replacement and painted guidelines restriping project.